Wastewater Projects

JCW Projects - In Progress

--
Nelson WWTP Complex Pilot Infiltration/Inflow Rehabilitation
Turkey Creek and Mission Main Service Areas
Sanitary Sewer Improvements Planned for Your Neighborhood
- I and I Hotline: 913-577-8490 / Email: iandihotline@gbateam.com -

Project Description

The project will include the repair of the sanitary sewer system to remove infiltration and inflow (I/I). The project areas are in the Mission Township Main (MTM1) and Shawnee Mission Turkey Creek (SMTC) watersheds as indicated on the figures to the right. The MTM1 project area is located in Prairie Village and the SMTC project area is located in Shawnee. Lessons learned from the design of this project will be used to develop the process and procedures for future removal of public and private sector I/I sources throughout the entire MTM1 and SMTC watersheds. After construction is completed, JCW will be able to evaluate the effectiveness and costs of numerous I/I removal strategies and then determine how best to achieve I/I removal in the remaining watershed areas.

>Click to see the general location map for MTM1 Strategy Areas.
>Click to see an enlarged map detail for SMTC Strategy Areas.


The pilot I/I rehabilitation project will include the following rehabilitation areas and strategies as identified on the two figures:

  • Everything – rehabilitate all main sewers, manholes, service line connections, and service lines; and remove all identified building and inflow sources/defects.
  • Private Only – rehabilitate all service line connections and service lines; and remove all identified building and inflow sources/defects.
  • Public Only – rehabilitate all main sewers and manholes.
  • Typical Comprehensive – rehabilitate main sewers and manholes that are contributing significant amounts of I/I; and remove all identified building and inflow sources/defects.
  • Typical Comprehensive + LL – rehabilitate main sewers and manholes that are contributing significant amounts of I/I; remove all identified building and inflow sources/defects; and rehabilitate all service line connections and lower laterals (i.e., service line between main sewer connection and a point between 3 and 10 feet from main sewer).
  • Control – no rehabilitation work will occur

This project will include three general types of construction:
  • Rehabiliatation of JCW, or public, main sewers and manholes.
  • Rehabilitation of private service lines (the pipe that connects private buildings to the main sewer).
  • Remove building and inflow sources/defects. For example, removal of jump pump discharge connections to the sanitray sewer. This construction may require access inside homes.
  • Please see the FAQs or contact the I and I Hotline for additional information.

Project Metrics

Public Sector Rehabilitation

  • Manhole Construction (5)
  • Manhole Rehabilitation (130)
  • Main sewer open cut excavation replacement (200 ft)
  • Main sewer (pipe bursting) trenchless replacement (400 ft)
  • Main sewer (CIPP lining) trenchless rehabilitation (30,000 ft)

Private Sector Rehabilitation

  • Cleanout Installations (360)
  • Service line open cut excavation replacement (11 properties)
  • Service line (pipe bursting) trenchless replacement (2 properties)
  • Service line (CIPP lining) trenchless rehabilitation (400 properties)

^UP


 

About Us | Customer Service | Engineering | Education | Site Map | Privacy Policy | Contact Us | Johnson County's Main Web Site
JCW Offices - 11811 S. Sunset Drive, Suite 2500 - Olathe, KS 66061-7061 - Phone: 913-715-8500 - Fax: 913-715-8501

- Protecting our environment - Serving our customers - Enhancing our communities -

- Updated 9/24/2011 -