Updated 1/30/2011
ENLARGE > Vacinity Map
ENLARGE > Improvements Map
Weekly Construction Schedule
Work scheduled for the week of January 30th:
• Construction will continue on sites 33 and 34.
• Construction will begin on Sites 32.
• Lane restrictions will be necessary on Glenview West and Terrace Trail West Streets.
>>> CIPP lining rehabilitation has begun. Click here for additional information regarding this process. >>>
Project Completion Status
As of December 28, 2011, the project is 43% complete.
Key Contacts
Primary Citizen Contact - GBA
Rick Blum (913) 219-3805
Owner - Johnson County Wastewater
Patrick Beane (913) 715-8684
Engineer - GBA
Waldo Margheim (913) 577-8218
Contractor - Rodriguez Mechanical Contractors, Inc.
Dave Scaggs (913) 281-1814
Project Background and Objectives
The Lake Quivira Sanitary Sewer Rehabilitation project is located in the City of Lake Quivira, Kansas. Existing sanitary sewers are located throughout the Lake Quivira community to provide sanitary service for residents. Because many of these sewer segments are approaching the end of their useful lives and/or do not meet current design standards to maintain and improve the level of service to the community, JCW is repairing and upgrading many of the sewers throughout the community.
JCW performed an extensive sanitary sewer evaluation study beginning in 2005. This study identified sewer system defects and provided recommendations for a rehabilitation project. These recommendations were then incoporated into construction plans that include the rehabilitation and replacement of approximately 22,000 feet of sanitary sewer. The construction project was awarded to a contractor in April 2011.
Ninety-nine properties will be directly affected by this project. These property owners have been contacted by mail (09/07/10) with a letter and exhibit detailing the work to be performed on their property.
Quick Facts
This project will consist of approximately:
> 9,000 feet of 8" diameter sewer rehabilitation
> 13,000 feet of 8", 10", and 12" diameter sewer replacement
> Rehabilitation of 84 manholes
Correspondence and Documents
^ UP
(05/04/11) PDF 3.3 MB
(04/24/11) PDF 60 KB
> Public Meeting Presentation (09/14/10) PDF 6 MB
> Temporary Construction Limits Exhibit Letter (09/07/10) PDF 107 KB
> Public Meeting Notice (08/31/2010) PDF 98 KB
> Preliminary Improvements (12/14/2009) PDF 4.5 MB
> Survey Activity Notice and Request for Information (11/11/2008) PDF 83 KB
> Notification of Field Activity (10/31/2008) PDF 30 KB
FAQ
^ UP
> FAQ Sheet – Project Specific PDF 100 KB
> FAQ Sheet – Restoration (including pictures) PDF 303 KB
> FAQ Sheet – Construction = What to expect during construction. PDF 69 KB