JCW Commercial Building Sanitary Sewer Permitting
New Commercial Building Construction
To acquire a building permit for a new commercial building (including multi-unit residential) in Johnson County Wastewater’s service area, a Sanitary Sewer Connection Permit must first be issued to the Property Owner from Johnson County Wastewater (JCW). Project plans should be submitted to JCW when they are submitted to the City for building permitting. The following documents are provided to guide the Property Owner, Building Owner, Engineer, Contractors and other interested parties through the Commercial Building Sanitary Sewer Connection permitting processes and to identify the requirements for the JCW Permit Site Plan and other project drawings. Once all required documents are provided to JCW, please allow up to fourteen (14) calendar days to receive initial review comments. Please allow up to seven (7) calendar days to receive comments for all subsequent reviews until permit issuance. Reviews are completed as quickly as possible in the order they are received.
Tenant Finish, Building Expansion, or Change of Use for Commercial Buildings
For building expansions or tenant finish of existing building space(s), where a change of use, expansion or modification to an existing building use occurs, JCW requires the Property Owner and/or Tenant to complete an application and submit construction plans for the issuance of a Modified Usage Permit. The Modified Use permit shall be issued to the Property Owner. The following documents are provided to guide the Property Owner, Building Owner, Engineer, Contractors, and Tenant through the Modified Use permitting process and to identify the requirements for the JCW Commercial Permit Site Plan and other project drawings. Once all required documents are provided to JCW, please allow fourteen (14) calendar days to receive initial review comments. Please allow seven (7) calendar days to receive comments for all subsequent reviews until permit issuance. Reviews are completed as quickly as possible in the order they are received.
-----
Commercial Sewer Permit Application Status
This link will allow you to view the review status page for a specified project. Submittal history and required project information status can be monitored. Select the project name from the drop down menu then select the “Check Status” link. If you are unable to find the project in the list, please call JCW at 913-715-8520.
COMMERCIAL PERMITTING STATUS REVIEW - Link to project list
Note: If another window pops open asking to accept the security on this website, please select “yes”.
-----
Commercial Sewer Permit Checklist
This document is to be used as a guide for submitting site and project information for commercial building projects to JCW for review.
PDF 16 KB, 1 page
-----
Commercial Sewer Permit with Main Extension Checklist
This document is to be used as a guide for submitting site and project information for commercial building projects that require a main extension or relocation to serve the site.
PDF 16 KB, 1 page
To access the Sewer Project Status page use the following link. Submittal history and the status of required project information can be monitored. Select the project name from the drop down menu then select the “Check Status” link. If you are unable to find the project in the list, please call JCW at 913-715-8520.
MAIN PROJECT STATUS – Link to project list.
-----
Sanitary Sewer Commercial Permit Application
The first step in applying for a sanitary sewer commercial permit is to complete the JCW Sanitary Sewer Commercial Permit Application. This document is used to provide applicant, project team and other project information to JCW for permitting.
PDF 85 KB, 4 pages
-----
Property Owner's Letter of Representation
According to the Johnson County Wastewater Sewer Use Code, Connection and Modified Use (tenant finish) permits shall be issued to the property owner. The property owner may provide the Letter of Representation to JCW authorizing the representative noted in the letter to execute the permit on the property owner’s behalf. This letter template must be copied onto the property owner’s letterhead, the project site and representative information entered, signed, and original submitted to JCW. The language of the letter may not be modified.
PDF 20 KB, 1 page
-----
Commercial Permit Site Plan Requirements
This document outlines drawing requirements for the Sanitary Sewer Commercial Permit Site Plan. The Permit Site Plan is required for any permit that includes exterior sewer piping and associated appurtenances. This Site Plan becomes part of the issued permit and a record of the installation.
PDF 97 KB, 15 pages
-----
Commercial Permit Site Plan Example
Please use this link to view a PDF version of an example Commercial Permit Site Plan drawing.
PDF 197 KB, 1 page
-----
Service Line Design & Construction Standards
This document lists JCW design and installation requirements and material specifications for sanitary sewer service lines and appurtenances.
PDF 16 KB, 2 pages
-----
Wash Bay Application
The Wash Bay Application is to be completed by a Kansas P.E. and returned to JCW (along with the standard application and other required submittal items) for review of areas used for washing vehicles, other equipment or other items. Please note that an exterior basin with an orifice on the discharge is required for all wash bays. Instructions for completing the application and providing additional information (including orifice basin design and sand-oil interceptor sizing) are included in the Application.
PDF 281 KB, 6 pages
-----
Swimming Pool Permit Checklist
This document provides guidance for submitting site and orifice basin design information related to swimming pools required for JCW review. Please note that only filter backwash is accepted from the pool. An exterior basin with an orifice on the discharge is required for all filter backwash discharges.
PDF 45 KB, 1 page
-----
Prohibited Discharge Statement Form
This document lists materials and chemicals prohibited from being discharged into the sanitary sewer system. The Discharge Statement shall be completed, signed, and the original Discharge Statement returned to JCW by the property owner or tenant for permit issuance.
PDF 35 KB, 1 page
-----
Grease Interceptor Detail
This detail is available in PDF and AutoCAD formats for use on the Sanitary Sewer Commercial Permit Site Plan.
PDF 177 KB, 1 page
AutoCAD 341 KB, 1 page - Zipped
-----
Sand/Oil Interceptor Detail
This detail is available in PDF and AutoCAD formats for use on the Sanitary Sewer Commercial Permit Site Plan.
PDF 176 KB, 1 page
AutoCAD 342 KB, 1 page - Zipped
-----
JCW Standard Detail Sheet
This detail sheet is available in PDF and AutoCAD formats for use on the Sanitary Sewer Commercial Permit Site Plan at the following links. The detail sheet includes cleanout, tee orientation and riser, manhole base section, standard embedments, reinforced concrete encasement, standard pre-cast manhole (eccentric & shallow-type), saddle, concrete collar, impervious ditch check, flexible wall connection, concrete manhole adapter, casing pipe and end seal, etc. details.
PDF 256 KB, 1 page
AutoCAD 742 KB, 1 page - Zipped
-----
Orifice and Basin Detail
This detail is available in PDF and AutoCAD formats for use on the Sanitary Sewer Commercial Permit Site Plan.
PDF 61 KB, 1 page
AutoCAD 377 KB, 1 page - Zipped
-----
Johnson County Code of Regulations for Sanitary Sewer Use - 2003 Edition
This document provides definitions, permit requirements, pretreatment requirements, enforcement remedies and other regulations for the use of the sanitary sewer system in the Johnson County Wastewater service area. Sanitary sewer connection and modified use permit information can be found in the Code.
PDF 850 KB, 76 pages
-----